Foundation and Structural Design

Shown here is Austin Engineering’s steel, concrete, and substation design for the Ruckles Substation upgrade. This photo was taken prior to a site visit to witness final grade before asphalting.

Austin Engineering completed the site preparation, design, and estimate, and reviewed and assessed existing flood hazard data to determine final grade elevations for the substation upgrade. AEL also completed the necessary surveying, soil sampling, preliminary site preparation design, and material quantities development for this substation upgrade.

 

Project Details