WIC - Boom Anchor Log Replacement

AEL provided quality control, assurance and project oversight for the Arrow Lakes Hydro log boom anchor cable replacement and inspection. Prior to the replacement, AEL also checked that all new materials were in accordance with the 1999 existing design by HARZA.

Castlegar, BC.

    Share This